Dear Colleagues
MEG is now up and running again. You can now book your MEG sessions
again through Claire.
It looks as though the Polhemus failed due to a fault in an serial line
isolator. So the whole system failed due to a £5 component. Sorry!
While we were waiting for a delivery of a new Polhemus system and the
engineeer, the YNiC team took the opportunity to reorganise the MEG
equipment room. The equipment and cables have been tidied, labelled and
organised. Please do not change anything in the equipment room as there
is now actually no need to change cables or equipment.
The camera has also been moved in the MSR (magnetically shielded room)
and it is now possible to monitor your subjects during an experiment
even if you are using the large screen. Please remember to tell your
subjects that they are being monitored.
Happy MEGing
Gary
--
Gary Green
York Neuroimaging Centre
The Biocentre
York Science Park
Innovation Way
Heslington
York
YO10 5DG
http://www.ynic.york.ac.uk
tel. 01904 435349
fax 01904 435356
mobile 07986 778954